6 Agar Street.

The major refurbishment of the offices at 6 Agar Street posed significant challenges due to the ongoing operation of a ground floor restaurant and basement gym throughout the construction process. However, using innovative engineering, we achieved an increase in commercial value for this building in London’s Covent Garden.

Redesign of a five-storey 1980s office building close to Covent Garden

Location
London, UK
Client
Legal & General
Architect
Darling Associates
Project Value
£15 million
Status
completed 2012
Expertise
Structures

The building is rectangular in plan, with a central courtyard. Following a fire, the site was almost entirely rebuilt in the mid-1980s with five floors, a rooftop enclosure for plant, plus a single-storey basement. This time around, extra lettable space was added thanks to our ingenious engineering. Existing plant structures above the fifth floor were removed, to make way for a new office floor within a steel-framed mansard roof, delivering 400 m² of additional space.

Meanwhile, the floor plates on each office floor were extended 6 m into one side of the courtyard, projecting from the central lift core, augmenting the floor area by a further 600 m².

Original drawings and calculations were obtained; the objective was to identify and utilise spare load capacity within the building, while ensuring that any new loading would not exceed the capacity of the structure within the restaurant and gym, as there was no opportunity to strengthen these elements.

Initiatives included harnessing the previously untapped vertical load capacity of the concrete central lift core, originally designed to provide the building with lateral stability.

As a result, the new courtyard floor plate extensions are largely supported on existing columns via load transfer beams, with the remainder hung from a metre-deep truss that cantilevers from the top of the central lift core. Furthermore, the floor plate extensions were designed to be as minimal as possible, using a steel frame plus composite floor slabs with lightweight concrete, without compromising dynamic performance.

Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.