engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

Blackwall Reach.

As part of the high-profile £500 million redevelopment of the Robin Hood Gardens Estate in east London, we are working alongside architects Karakusevic Carson and Metropolitan Workshop to deliver almost 500 high-quality residential units, predominantly private, across two phases (1B and 2).

High-profile redevelopment in East London to deliver 500 residential units over two phases

Location
London, UK
Client
Swan Housing Group
Architect
Karakusevic Carson, Metropolitan Workshop
Project Value
confidential
Status
Phase 1 completed 2020
Expertise
Structures

Buildings due for demolition include a Victorian church hall, newer warehouses, a community building and a pair of residential blocks. Prior to its industrial usage the site is known to have been home to a number of Victorian terraces.

This variety of building types requires extensive investigation works to establish the scope of foundations and the nature of basements below the current structures. The Blackwall Tunnel and main trunk sewers will necessitate technical agreements with TfL and Thames Water. Proximity to rail lines requires liaison with DLR, and a multitude of services currently run beneath the buildings; surveys will ascertain their exact routes.

The three new blocks of Phase 1B will not incorporate basement levels; foundations comprise an RC raft beneath the central cores, and will be designed to bridge across the sewers where necessary. The Blackwall Tunnel also forms a major constraint for Blocks H and L in particular, and works will require further consultation with TfL to ensure the tunnel infrastructure is not affected. In terms of superstructure, the blocks vary between 10 and 24 storeys, utilising concrete throughout, combining concrete flat slabs with perimeter columns to allow flexibility of internal layout. Inset balconies form continuations of the floor slabs, with no thermal break.

Phase 2 will make use of the existing lower ground level to construct a new basement under two blocks, avoiding the large excavations that would normally be required. The development will comprise four new buildings (one 9-storey and three 10-storey), predominantly comprising reinforced concrete frames, flat slabs and RC columns. Two blocks will incorporate mezzanine floors and transfer slabs at level two to accommodate the steps in the building envelope.

NXQ Manchester thumbnailNXQ
Manchester
 
 
Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.