Redeveloping two adjoining buildings on London’s King’s Road posed a number of significant engineering challenges. The result is the deployment of innovative and complex structural solutions that produced a more sustainable alternative to demolition and reconstruction, while also being sympathetic to the conservation of a prominent area.

Remodelling and refurbishment of two adjacent structures on King’s Road, Chelsea

Location
London, UK
Client
CIT
Architect
GRID Architects
Project Value
£8 million
Status
completed 2012
Expertise
Structures

The existing Chenil House & Galleries building to the rear was constructed c. 1927 and has seen a number of uses throughout its lifespan, ranging from semi-industrial to retail, and also commercial offices. There is a great deal of history associated with the site, but the existing buildings had a very poor and irregular layout that was not suited to refurbishment.

The site is located in a conservation area, and hence the challenge to us was to advise the client on how best to achieve the areas and efficiencies required, whilst maintaining as much of the historical envelope as possible.

This involved demolition of the ancillary buildings to the rear of the site, and also demolition of the existing internal frame to Chenil House. The King’s Road façade to the north and east sides of the building have been retained along with the existing roof structure, which required a complex set of temporary works installed pre-demolition.

Within the development but to the side of the main Chenil House building was an existing Dutch Gable façade, which was set back approximately four metres from the face of Chenil House. This step back resulted in a significant loss of internal area, but the façade could not be demolished due to the conservation area status. Our proposal was to clamp the gable end into a system of temporary works, and slide it forward, then secure it in position with the new primary structure frame. This process was completed without damage to the existing gable.

Our involvement in both the façade retention and the gable sliding were key inputs into the planning process, and the subsequent dismissal of associated planning conditions.

The site also involved a significant series of party wall interfaces with the neighbouring residential buildings, and Chelsea Old Town Hall.

Awards.

2012 IStructE Structural Award

Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.