engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

No. 1 New Oxford Street.

We worked with Orms Architects and client TH Real Estate to design the refurbishment of the nine-storey Commonwealth House in Camden. The aim was to increase the lettable floor area, improve internal circulation and update the cladding to reflect current market standards. The success of this project has attracted high-profile tenants such as COS.

Refurbishment of a commercial office in London, requiring the construction of additional floors

Location
London, UK
Client
TH Real Estate
Architect
Orms Architects
Project Value
confidential
Status
completed 2017
Expertise
Structures

Refurbishment included the addition of floors on the top levels, the removal of some internal structure and infilling of the internal atrium. A lobby was created on the ground floor, and a partial terrace area at roof level.

Post Office tunnels, built around 1913, pass directly beneath the site at 14 m below ground level, so the impact of these on the proposed scheme had to be considered. It was agreed that a 10 % increase in overall load was acceptable. The nearby abandoned London Underground British Museum station also had to be considered.

Large parts of the existing building required demolition, particularly above level 6, including some columns, the south-west core masonry walls and stairs, lift cores and slabs in the two northern cores, the internal atrium façade and the façade where floorplates were extended. Temporary supports were required in places.

The demolition of the 7th, 8th and roof slab allowed for the construction of new steel floors, including an additional floor and new roof terrace. Also, partial infill of the atrium provided new floor areas, improving circulation with the introduction of new RC lift cores and the removal of the existing atrium façade.

A key part of the design was the retention of the existing clock tower, which was extended vertically to create an elevated walkway and viewing platform at the top of the building. This meant that existing beams required strengthening to take the additional loading.

Awards.

2019 BCO Regional Awards – Highly Commended

2018 RIBA Regional Award

2018 New London Awards – Commendation

2015 New London Award

Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.