engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

Olympic Energy Centres.

Two large-scale energy centres fulfilled a crucial role in London’s plans for the Games, providing sustainable heat and power to the Olympic Park and Athletes’ Village. Cited as ‘miniature Tate Moderns’, they were constructed as sheds up to 80 m long, with aesthetics reflecting their industrial function.

Large-scale energy centres with steel frames designed for future flexibility

Location
London, UK
Client
Cofely East London Energy
Architect
John McAslan + Partners
Project Value
£ 15 million (shell and core only)
Floor Area
7,500 m²
Status
completed 2011
Expertise
Structures

The centres were on two separate sites: the Kings Yard Energy Centre served the 2012 London Olympic Park and the residential developments that followed the end of the Olympics, while the Stratford City Energy Centre caters to proposed developments in an area slightly to the east.

At Kings Yard, we refurbished an adjacent Edwardian building to house a biomass boiler, connected to the centre via a new link bridge; alongside the gas engines and ammonia electric chillers in the main buildings, these provided both electricity and temperature control to the Olympic buildings.

Due to the length of both buildings and the long spans required, we recommended steel as the framing material; this was lightweight, could be easily assembled and would meet the exacting deadline required. Chimney flues reached up to 42 m in height, and were crane lifted into place in one piece to save time.

In terms of floor construction, prefabrication was preferable given the time span, but the weight of individual plant housed by the structures called for the strength of an in-situ solution. Working the structure around the equipment, we combined the two options and proposed Omnia floors, pouring a thin layer of in-situ concrete over precast planks.

We staggered the programmes to allow the plant to be installed once the frame was up, before the construction of the roof or masonry walls. The buildings’ flexibility also extends beyond their initial construction programme; if any equipment needs to be removed and updated, the metal mesh façades, which were assembled independently of the main structures, are easily demountable.

Awards.

2013 RIBA National Award

Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.