Queens Apartments.

The brickwork façade of Queensway’s art deco cinema in west London is a local landmark that planners and residents were keen to retain despite redevelopment of the site. Our challenge was to design a new concrete frame structure housing sixteen luxury apartments across five storeys, to sit behind the existing frontage.

Sixteen high-quality apartments in Derwent’s first residential scheme in West London

Location
London, UK
Client
Derwent London
Architect
Stiff + Trevillion
Floor Area
3,000 m²
Status
completed 2014
Expertise
Structures

Working within the constraints of the site, which is set close to adjacent buildings in a dense urban context, we needed to provide support for the masonry on both a temporary and permanent basis. The façade was initially propped by means of a steel frame alongside its outside edge, fixed by steel clamps which run through to the inside of the brickwork. Once the new concrete-framed structure was in place, this in turn would provide lateral support, connected via a lightweight steel framing system.

Demolition, foundation work and subsequent construction were necessary, but first we reviewed the history of the site including the original 1930s architectural drawings, assessed the building’s condition and investigated the ground make-up. We found that an existing basement had been backfilled with rubble during works undertaken in the 1990s; to simplify the process, we specified piled foundations, which was the only option that did not require removal of the entire existing basement. To minimise impact on the façade, which needed to remain structurally sound, we positioned new piles as far away as possible from the existing masonry.

Above ground, we used flat slab construction and implemented a number of transfer structures to allow the grids to adapt to the requirements of each level, maximising the potential of retail and residential units as well as the ground floor car park. We achieved stability via a reinforced concrete core at the centre of the building, and an offset concrete wall on the north-west side of the building. The ground floor slab acted as a diaphragm to redistribute forces transferring down through these elements.

Awards.

 

2016 Civic Trust Award – Commendation

2015 RIBA Regional Award

Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Town FC
Stadium.
 
 
St Pancras Campus thumbnailSt Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Malaika
School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
3290_HighRes_render_N9_hdThe
Gaumont.
 
 
5448_N8_hdCrinkle-Crankle
Concrete.
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.
 
Roatan
Prospera.