engineering.
Oops! Looks like your browser is out of date. Is this page displaying correctly? If not, try upgrading your browser or use a different one.

TNQ.

As part of a masterplan to redevelop this former retail and industrial site in north-west London, we worked alongside architects Dunnett Craven to provide structural solutions for five high-rise blocks ranging between eight and nineteen storeys, providing residential units above a common podium deck, and retail and car park space below.

Five high-rise residential blocks with associated retail and parking in North West London

Location
London, UK
Client
Royal London Asset Management, NEAT Developers
Architect
DunnettCraven
Project Value
£65 million
Status
completed 2015
Expertise
Structures

An access road running through the centre of the site divides the buildings, with Blocks A and B to the west and C, D and E to the east, close to the busy Edgware Road. Both groups of buildings are linked at low level by a single podium deck. Though structural solutions were considered individually, we aligned simple, strong engineering principles with the architectural ideals in the masterplan to ensure a sense of continuity. Façade treatments were consistent throughout, and in all five blocks the top two storeys are set back from the perimeter to create desirable roof terraces.

All structures comprise in-situ concrete frames, while grids vary according to function. We undertook a verticality study of the residential areas to determine in which areas we could simplify the structure by providing regular, common grids. Where this was not possible, we sought to maintain consistent floor zones to simplify service runs.

We designed grouped, piled foundations, the most appropriate solution given the depth of made ground with little cohesion, and the high point loads created by the column grids above. Podium decks are a feature of all blocks; we adopted several different thicknesses, dependent on spans and loadings, and column arrangements below. Wherever possible, we aligned the grids above and below the podium, but transfer structures were also necessary in places, set within the depth of the finishes zone. We used post-tensioned concrete transfers beams over the loading bay to provide the clear spans needed for vehicle tracking. Similarly, we designed a cantilever transfer beam to enable Block E to step out above the podium.

 

Aerial shot of campus masterplan.TTP
Campus.
 
 
Two
Manhattan
West
Lobby
'Radiant Lines'
installation
 
 
A Brick for Venice thumbnailA Brick
for Venice.
 
 
One
Gosvenor
Square
 
Stephen A. Schwarzman Centre for the Humanities thumbnailThe Stephen A. Schwarzman
Centre for the Humanities
 
 
Albert Bridge House thumbnailAlbert Bridge House.
 
 
 
Edgar's Sheds thumbnailEdgar's
Sheds.
 
 
Luton     Power Court
Stadium.
 
 
Wide shot of St Pancras Campus on site with facade installation complete.St Pancras
Campus.
 
 
Wind Sculpture
(TG) I
 
 
Sentosa
Sensoryscape.
 
 
The
Beacon.
 
 
Liverpool
School of
Architecture.
 
Georges Malaika
Foundation School.
 
 
Cherry
Groce
Memorial.
 
Khudi
Bari.
 
 
Haus Gables thumbnailHaus
Gables.
 
 
10   Lewis
Cubitt
Square.
 
'Drift'
footbridge.
 
 
The Gaumont ThumbnailThe
Gaumont.
 
 
5448_N8_hdSeratech
 
 
 
4926_HiRes_rendering_N7_hdApex
1.
 
 
5008_highRes_image_N3_hdUCB
Headquarters
Campus.
 
Manor    Road
Quarter.
 
 
17 Charterhouse
Street.
 
 
Brent Cross
Plot 15.
 
 
100-West-Cromwell-Road-thumbnail100
West Cromwell
Road.
 
Brent Cross
Plot 25.
 
 
Chapter
London
Bridge.